Step-by-step
A practical plan for the job.
- 1
Describe what is actually leaving
Count rooms or rolls and estimate the floor area involved. Note whether the pile includes padding, wood trim, tack strips, or other flooring. Take an overall photo and a close-up so the installer, facility, or hauler can distinguish the materials.
- 2
Resolve the removal scope first
This guide concerns material that has already been removed safely. If flooring or adhesive remains installed and its composition is uncertain, pause and consult a qualified professional. DEQ provides asbestos information and specialist resources; do not disturb suspect material to make hauling easier.
- 3
Check realistic reuse options
ReBuilding Center's guidelines distinguish acceptable carpet squares from rolled carpet, pads, and tack strips, which it excludes. Get approval before making a donation trip. For a separate reusable rug, provide dimensions, condition, and photos rather than describing it simply as carpet.
- 4
Compare the complete removal job
Ask an installer whether take-away is included and exactly what it covers. For self-haul, confirm facility acceptance before loading. JunkPDX can assess already-removed, approved construction debris with a free onsite estimate; hauling is paid and the destination depends on the material and condition.