Step-by-step
A practical plan for the job.
- 1
Assign plumbing preparation
Confirm who disconnects supply and waste connections and leaves the room ready for the next installer. Ask the plumber about any haul-away already included. Do not schedule the collector as though they are responsible for capping lines or correcting leaks.
- 2
Record the fixture details
For a toilet, photograph the model or flush label, tank and matching lid. For a sink, show its material, dimensions and whether a pedestal or vanity is attached. Explain chips, cracks and leftover mounting parts before it is moved.
- 3
Check reuse before booking transport
ReBuilding Center reviews sinks and toilets under its fixture guidelines. Ask about your specific unit rather than assuming all usable plumbing is accepted. Keep approved matching pieces together; a missing lid or damaged surface can change the decision.
- 4
Plan weight and breakage
Cast-iron sinks and attached countertops can be much heavier than they appear. Broken porcelain can create sharp edges, so disclose damage and ask for handling instructions. Do not break fixtures into small pieces to make them seem like ordinary bagged rubbish.